Chanter Street, Berrigan - Undergrounding of Overhead Power

  • Project typeMain Street Upgrades
  • Project value$1.1 million
  • Project scheduleIncomplete
Chanter Street main.PNG

To minimize disruptions during key community events such as the Berrigan Cup and the Christmas Street Market, the Council has decided to postpone the construction on Chanter Street until February 2025.

Project Overview

The Chanter Street powerline undergrounding project is a critical initiative aimed at modernizing the power infrastructure in the heart of Berrigan. This project will replace the overhead poles and wires along Chanter Street, between IGA and Jerilderie Street, with approximately 350 meters of underground power cables. The project includes the installation of five crossings that will connect to power boxes on the opposite side of the street. Additionally, conduits will be installed to property boundaries, minimizing the impact on footpath surfaces.

Project Goals

The Chanter Street powerline project serves two primary objectives:

  • Safety, Reliability, and Aesthetic Enhancement: The project will enhance safety, improve the reliability of power distribution, and significantly upgrade the visual appeal of the main street by transitioning to underground infrastructure. This aligns with regulatory standards and supports community-led modernization efforts.
  • Heritage Façade Preservation: Property owners will be able to maintain their building façades without the need for a full street power shutdown, preserving the historical character of the heritage conservation zone.

Funding and Costs

This $590,000 project is proudly funded by the NSW Government under Phase 5 of the Stronger Country Communities Fund. While the project budget covers the transition from overhead to underground power infrastructure, individual property reconnections are not included. The estimated reconnection cost is $13,500 per property. To mitigate this expense, the Council is developing a plan to offer joint procurement and flexible payment options for property owners.

Construction Phases and Deliverables

The Chanter Street powerline project will be carried out in several key phases:

  • Stage 1 – Coordination and Planning: Stakeholders will work together to finalize project details, obtain necessary approvals, and ensure compliance with safety and regulatory standards.
  • Stage 2 – Feasibility Studies and Design: In-depth studies will be conducted to evaluate the practicality and cost-effectiveness of the undergrounding process. Design plans will be prepared to meet technical and safety requirements.
  • Stage 3 – Community Consultation: Open communication with the community will ensure the project meets local needs, and financial contributions will be discussed during this stage.
  • Stage 4 – Procurement and Tendering: Resources, materials, and services will be procured through a transparent tendering process.
  • Stage 5 – Construction: The construction phase will include the removal of 350 meters of overhead powerlines and the installation of underground cables and service connections. Safety measures will be implemented to minimize disruptions and hazards during this phase.

The completion of this project will greatly enhance the safety, reliability, and aesthetic appeal of Chanter Street, fostering a more attractive and vibrant community space for residents, businesses, and visitors alike.

 